Quick Answer: To calculate asphalt, multiply Length (ft) x Width (ft) x Thickness (in) / 12 / 27 to get cubic yards, then multiply by density and divide by 2,000 for tons. Hot mix asphalt weighs 3,960 lbs/cu yd (~2 tons). Cold patch weighs 3,500 lbs/cu yd. One ton of hot mix covers about 82 sq ft at 2 inches thick. Add 10% for waste. A 20 x 20 ft driveway at 2 inches thick needs about 2.47 cubic yards or 4.89 tons of hot mix, or 5.38 tons with waste.
How to Calculate Asphalt
The formula for calculating asphalt volume and weight is:
Cost = Weight (tons) × Price per ton
- Measure the length and width of your paving area in feet.
- Determine your asphalt thickness (2-3 inches for driveways, 3-4 inches for parking lots).
- Multiply length × width to get the area in square feet.
- Multiply the area by the thickness (converted to feet) to get the volume in cubic feet.
- Divide by 27 to convert to cubic yards, then multiply by the asphalt density to get the weight.
- Add 10% for waste and compaction variability.
Asphalt is sold by the ton. The densities are for compacted asphalt, so enter the finished thickness. The calculator defaults to 10% waste and $125 per ton; replace the price with your supplier's quote.
Asphalt Thickness Guide
Recommended asphalt thickness varies by application and expected traffic load:
| Application | Recommended Thickness | Gravel Base |
|---|---|---|
| Residential Driveway | 2-3 inches | 6-8 inches |
| Parking Lot | 3-4 inches | 8-12 inches |
| Road / Heavy Traffic | 4-6 inches | 12-18 inches |
| Overlay / Resurfacing | 1.5-2 inches | Existing surface |
Hot Mix vs Cold Patch
Hot mix asphalt is made at a plant by heating aggregate and liquid asphalt binder together. It must be hauled and laid while hot, so you need a paving crew and equipment.
Cold patch asphalt is sold premixed in bags at hardware stores. It does not compact as densely as hot mix, cracks more easily, and typically lasts 1-3 years. Use it for spot repairs, not for full paving projects.
Tips for Asphalt Projects
- Sub-base preparation: A properly graded and compacted gravel base is essential. Poor sub-base preparation is the leading cause of asphalt failure and cracking.
- Compaction: Asphalt must be rolled with a heavy roller while still hot. Each pass increases density and durability. Proper compaction reduces the volume by about 25% from loose material.
- Drainage: Ensure your paved surface has a slight slope (1-2% grade) to direct water away. Standing water accelerates asphalt deterioration.
- Sealcoating: Apply a sealcoat every 2-3 years to protect against UV damage, water penetration, and oil stains.
Have Your Tonnage?
Calculate Your Full Driveway Paving Cost →
Get a location-specific estimate including materials, labor, grading, and contractor markup.
Related Calculators
- Gravel Calculator — calculate gravel for driveways, paths, and sub-base
- Concrete Calculator — estimate concrete for slabs, footings, and foundations
- Cubic Yard Calculator — convert any dimensions to cubic yards