HowMuchStuff

Asphalt Calculator

By Taro Schenker | Updated February 11, 2026

Quick Answer: To calculate asphalt, multiply Length (ft) x Width (ft) x Thickness (in) / 12 / 27 to get cubic yards, then multiply by density and divide by 2,000 for tons. Hot mix asphalt weighs 3,960 lbs/cu yd (~2 tons). Cold patch weighs 3,500 lbs/cu yd. One ton of hot mix covers about 80 sq ft at 2 inches thick. Add 10% for waste. A 20 x 20 ft driveway at 2 inches thick needs about 1.48 cubic yards or 2.93 tons.

Calculate how much asphalt you need for your driveway, parking lot, or road project. Enter your dimensions and thickness to get the exact volume in cubic yards, weight in tons, and estimated material cost.

How to Calculate Asphalt

The formula for calculating asphalt volume and weight is:

Weight (tons) = Length (ft) × Width (ft) × Thickness (in) ÷ 12 ÷ 27 × Density (lbs/cu yd) ÷ 2000
  1. Measure the length and width of your paving area in feet.
  2. Determine your asphalt thickness (2-3 inches for driveways, 3-4 inches for parking lots).
  3. Multiply length × width to get the area in square feet.
  4. Multiply the area by the thickness (converted to feet) to get the volume in cubic feet.
  5. Divide by 27 to convert to cubic yards, then multiply by the asphalt density to get the weight.
  6. Add 10% for waste and compaction variability.

Asphalt Thickness Guide

Recommended asphalt thickness varies by application and expected traffic load:

ApplicationRecommended ThicknessGravel Base
Residential Driveway2-3 inches6-8 inches
Parking Lot3-4 inches8-12 inches
Road / Heavy Traffic4-6 inches12-18 inches
Overlay / Resurfacing1.5-2 inchesExisting surface

Hot Mix vs Cold Patch

Hot mix asphalt is the industry standard for paving driveways, parking lots, and roads. It is produced at a plant where aggregate and liquid asphalt binder are heated to 300-350°F and combined. It must be transported and laid while hot, which means you need professional equipment and crew. Hot mix compacts tightly, creating a smooth and durable surface that lasts 15-20 years with proper maintenance.

Cold patch asphalt is a pre-mixed product available in bags at hardware stores. It can be applied at any temperature, making it ideal for emergency pothole repairs and small patches. However, cold patch is a temporary fix for most applications. It does not compact as densely as hot mix, is more susceptible to cracking, and typically lasts 1-3 years. Use cold patch for spot repairs, not for full paving projects.

Tips for Asphalt Projects

  • Sub-base preparation: A properly graded and compacted gravel base is essential. Poor sub-base preparation is the leading cause of asphalt failure and cracking.
  • Temperature matters: Only pave when air temperatures are above 50°F. Asphalt cools quickly in cold weather and will not compact properly.
  • Compaction: Asphalt must be rolled with a heavy roller while still hot. Each pass increases density and durability. Proper compaction reduces the volume by about 25% from loose material.
  • Drainage: Ensure your paved surface has a slight slope (1-2% grade) to direct water away. Standing water accelerates asphalt deterioration.
  • Sealcoating: Apply a sealcoat every 2-3 years to protect against UV damage, water penetration, and oil stains. This extends the lifespan of your asphalt significantly.

Formula Summary

Asphalt Volume Formula: To calculate the cubic yardage of asphalt needed, multiply the Length (ft) x Width (ft) x Thickness (in), divide by 12 to convert thickness to feet, then divide by 27 to convert cubic feet to cubic yards.

$$V_{\text{cu yd}} = \frac{L_{\text{ft}} \times W_{\text{ft}} \times T_{\text{in}}}{12 \times 27}$$

Weight Formula: $$W_{\text{tons}} = \frac{V_{\text{cu yd}} \times \rho}{2000}$$ where $\rho$ is the asphalt density in lbs/cu yd.

Cost Formula: $$\text{Cost} = W_{\text{tons}} \times \text{Price per ton}$$

Asphalt TypeDensity (lbs/cu yd)
Hot Mix (Standard)3,960
Cold Patch3,500

Standard Assumptions: Waste factor of 10% accounts for compaction variability, uneven sub-grade, and material waste. 1 cubic yard = 27 cubic feet. 1 ton = 2,000 lbs. Asphalt is sold by the ton. Hot mix must be laid at 300-350 degrees F.

Related Calculators

Estimates are for planning purposes only. Consult a qualified contractor for critical projects. Actual material requirements may vary based on site conditions, waste, and installation methods.

Pricing last verified: February 2026. Material prices vary by region, season, and supplier. Prices shown are national averages for planning purposes.

Frequently Asked Questions

How thick should asphalt be for a driveway?
A residential driveway typically needs 2-3 inches of hot mix asphalt over a properly prepared gravel base. For heavier traffic or commercial use, 3-4 inches is recommended. The sub-base layer of compacted gravel underneath should be 6-8 inches thick for adequate drainage and support.
How much does asphalt cost per ton?
Hot mix asphalt typically costs $80-150 per ton depending on your location, the mix design, and current oil prices. A ton of asphalt covers roughly 80 square feet at 2 inches thick. Cold patch asphalt for repairs costs $10-50 per bag (50 lbs) at hardware stores, which is significantly more expensive per ton but practical for small jobs.
What is the difference between hot mix and cold patch asphalt?
Hot mix asphalt is heated to 300-350 degrees Fahrenheit at a plant and must be laid while hot. It is the standard for driveways, parking lots, and roads because it compacts tightly and lasts 15-20 years. Cold patch asphalt can be applied at ambient temperatures and is designed for pothole repairs and small patches. It is not suitable for full paving projects.
How much does a cubic yard of asphalt weigh?
Hot mix asphalt weighs approximately 3,960 lbs (about 2 tons) per cubic yard when compacted. Cold patch asphalt is slightly lighter at roughly 3,500 lbs per cubic yard. One ton of hot mix asphalt covers about 80 square feet at 2 inches thick or about 54 square feet at 3 inches thick.
How much does it cost to pave a driveway with asphalt?
A typical two-car driveway (20 x 20 feet) paved with 2 inches of hot mix asphalt requires about 3-4 tons of material, costing $300-600 for materials alone. With professional installation, grading, and base preparation, the total cost is usually $3,000-7,000. Larger driveways and thicker applications will increase costs proportionally.
When is the best time to pave with asphalt?
The best time to pave asphalt is late spring through early fall when temperatures are consistently above 50 degrees Fahrenheit. Hot mix asphalt needs warm conditions to compact properly. Avoid paving in rain, as moisture prevents proper bonding. Most paving contractors are busiest in summer, so scheduling in late spring or early fall may offer better pricing and availability.